Build-to-Suit Opportunities
|
Development Acreage:
Site A: +14.5 acres Sites B1 & B2: +14.5 acres |
Zoning:
RO-1 Research office - Data Center permitted use |
|
Natural Gas:
Two (2) natural gas services from Elizabethtown Gas. One (1) 4” line at ~50psi One (1) 6” steel line ats ~50psi - Can be upgraded to a high-pressure Water: 18’ main serves the site Onsite wastewater treatment |
Power:
Campus is fed via PSE&G’s 69kV transmission system. PSE&G’s standard design is to feed the 69kV network from three sources. For Princeton West, the sources are PSE&G’s Lawrence, Bridgewater, and Brunswick switching stations. Each switching station is fed from the regional transmission grid. PSE&Gs 69kV system is designed to provide the sites with N+1 service. Total of 72MW of capacity available on the campus. A second substation is planned, with will serve letter in hand to add additional 42MW capacity at 69kV service. Fiber: Crown Castle, Hudson Fibre, Optimum Lightpath, Verizon and Zayo |